Imna Isfahan subway launched by presence of Iran's FM Isfahan subway line with the presence of the Foreign Minister, the Governor, members of the City Council and the mayor launched.
۱۳۹۵ سه شنبه ۱۰ فروردين - تعداد بازدید: 2099 بار
In 1380, final plan of metro line with a length of 12.5 km was approved and construction of tunnel operations began. After running 7.7 km to the North-South metro line was added to that.
It was in three pieces and now, 12 km from the northern part of the Ghods Square to Shohada Avenue is ready for operation.
For the first metro line of 20 stations is anticipated consist of Pasdaran,Kaveh,Modares,Imam hossein, Enghelab,Shariati,Azadi and sofeh.  From these 20 stations of subway line 10 station between Ghods to Chamran is ready for operation. Executive operations of Imam Hussein and Enghelab Square started a few months ago.
برچسب ها:
Isfahan
Jamalinejad
ارسال به شبکه های اجتماعی:
تصاویر مرتبط
نظر شما درباره این مطلب:
دیدگاه های ارسال شده توسط شما، پس از تایید توسط مدیریت پورتال منتشر خواهد شد
پیام هایی که حاوی تهمت یا افترا باشد منتشر نخواهد شد
پیام هایی که به غیر از زبان فارسی یا غیر مرتبط با خبر باشد منتشر نخواهد شد
Dr Mahdi Jamalinejad Website. Copyright 2015
کلیه حقوق این سایت متعلق به دکتر مهدی جمالی نژاد می باشد.